Visual Materials
Boulder-Chino Transmission Line (3rd)
You might also be interested in

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 mile 103. 12' rod against vertical bank at right. 9' rod is 8.5' left and level with 12' rod. Both rods on centerline. Tower at left. Looking northeasterly.
photCL SCE 02 - 27895

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Also showing existing slope of ground. Vertical rod at 5.5', horizontal rod at 8.9'. Rods on centerline, facing northwesterly.
photCL SCE 02 - 27890

Boulder-Chino Transmission Line (3rd) - Rod on centerline - facing northwest
Visual Materials
Boulder-Chino Transmission Line (3rd) - Rod on centerline - facing northwest - Rod 12' long. Showing excavation of soil at and between towers 1 & 2 at mile 103 - Hayfield-Highgrove 220kV.
photCL SCE 02 - 27889

Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Rods on centerline
Visual Materials
Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Rods on centerline - 9' Rod against vertical bank is .2' in ground. 12' Rod at toe of slope. Looking north.
photCL SCE 02 - 27891

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Storm damage near M42T2. Looking northerly along old road west of Mr. Dunn's property. Photo taken from Beacon tower.
photCL SCE 02 - 26735

Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 at mile 103. Looking north
Visual Materials
Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 at mile 103. Looking north - white post in foreground is south of property line. 12' rod on centerline.
photCL SCE 02 - 27892