Boulder-Chino Transmission Line (3rd)



You might also be interested in

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 mile 103. 12' rod against vertical bank at right. 9' rod is 8.5' left and level with 12' rod. Both rods on centerline. Tower at left. Looking northeasterly.

    photCL SCE 02 - 27895

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Also showing existing slope of ground. Vertical rod at 5.5', horizontal rod at 8.9'. Rods on centerline, facing northwesterly.

    photCL SCE 02 - 27890

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 at mile 103. 12' rod against vertical bank at upper center. Bisch off at centerline and property line 33.6' east of tower center and 12' west of bank. Bottom of 9' rod 2.6' above top of 12' rod. White rag on top of 12' rod. White post in center is property line. Cone of loose earth at lower right is from Edison property. Facing northerly. Bottom of 12' rod is about 46' east and 24' below east tower footings.

    photCL SCE 02 - 27894

  • Boulder-Chino Transmission Line (3rd) - Rod on centerline - facing northwest

    Boulder-Chino Transmission Line (3rd) - Rod on centerline - facing northwest

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Rod on centerline - facing northwest - Rod 12' long. Showing excavation of soil at and between towers 1 & 2 at mile 103 - Hayfield-Highgrove 220kV.

    photCL SCE 02 - 27889

  • Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Rods on centerline

    Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Rods on centerline

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Showing excavation of soil at and between towers 1 to 2 at mile 103. Rods on centerline - 9' Rod against vertical bank is .2' in ground. 12' Rod at toe of slope. Looking north.

    photCL SCE 02 - 27891

  • Boulder-Chino Transmission Line (3rd) - Camera at edge of fill. Rod about 25' north of centerline - facing southwest

    Boulder-Chino Transmission Line (3rd) - Camera at edge of fill. Rod about 25' north of centerline - facing southwest

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Camera at edge of fill. Rod about 25' north of centerline - facing southwest - Rod 12' long. Showing excavation of soil at and between towers 1 & 2 at mile 103 - Hayfield-Highgrove 220kV.

    photCL SCE 02 - 27888