Boulder-Chino Transmission Line



You might also be interested in

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - Stark crew at Mile 15-2 setting stubs.

    photCL SCE 02 - 20238

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - Lava at Mile 135-2

    photCL SCE 02 - 20230

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - Excavation at Mile 8-2

    photCL SCE 02 - 20237

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - Footings in Lucerne Valley

    photCL SCE 02 - 20457

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 at mile 103. 12' rod against vertical bank at upper center. Bisch off at centerline and property line 33.6' east of tower center and 12' west of bank. Bottom of 9' rod 2.6' above top of 12' rod. White rag on top of 12' rod. White post in center is property line. Cone of loose earth at lower right is from Edison property. Facing northerly. Bottom of 12' rod is about 46' east and 24' below east tower footings.

    photCL SCE 02 - 27894

  • Boulder-Chino Transmission Line

    Boulder-Chino Transmission Line

    Visual Materials

    Boulder-Chino Transmission Line - New footings in Lucern Valley.

    photCL SCE 02 - 20268