Visual Materials
Placing reinforcing steel in foundation mat for 42" pipe extension prior to pouring concrete
You might also be interested in

Showing foundation for 42" pipe extension after pouring 18" mat
Visual Materials
Showing foundation for 42" pipe extension after pouring 18" mat. Note rock shear keys projecting above concrete.
photCL SCE 02 - 20146

Showing foundation mat steel in foreground and portion of mat concrete in background
Visual Materials
Showing foundation mat steel in foreground and portion of mat concrete in background.
photCL SCE 02 - 20144

View of excavation for 42" sluice pipe upper end after concrete foundation was poured up to base of 12" bearing wall
Visual Materials
View of excavation for 42" sluice pipe upper end after concrete foundation was poured up to base of 12" bearing wall.
photCL SCE 02 - 20145

Long Beach Steam Station - Discharge Conduit - Placing invert reinforcing steel
Visual Materials
Long Beach Steam Station - Discharge Conduit - Placing invert reinforcing steel - Station 6+75
photCL SCE 02 - 28118

Big Creek - Mammoth Pool - Pouring concrete in rock crusher foundation
Visual Materials
Big Creek - Mammoth Pool - Pouring concrete in rock crusher foundation.
photCL SCE 06 - 45721

Portal Powerhouse
Visual Materials
Portal Powerhouse - Placing reinforcing steel for concrete disc, steel plate bulkhead.
photCL SCE 02 - 43901