Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Powerhouse 2a penstock



You might also be interested in

  • Powerhouse 2a

    Powerhouse 2a

    Visual Materials

    Powerhouse 2a - Looking towards the West Portal from a point below the outlet of the Shaver Tunnel along penstock 2a. Riveted pipe in this section.

    photCL SCE 02 - 14900

  • Powerhouse 2a penstock

    Powerhouse 2a penstock

    Visual Materials

    Powerhouse 2a penstock - Looking uphill from the S. J. & E. RR crossing at West Portal Anchor #5, and the surge chamber alongside it. Anchor #5 still has the concrete forms on it.

    photCL SCE 02 - 14829

  • Powerhouse 2a

    Powerhouse 2a

    Visual Materials

    Powerhouse 2a - Looking downhill along penstock for Powerhouse 2A from the point above the S.J.E. & R.R. at West Portal. The pipe showing in the picture is the Ferrum banded. The concrete culvert enclosing the penstock is shown in the picture where the pipe passes through the culvert and under the SJ&E Railroad. .

    photCL SCE 02 - 14896

  • Powerhouse 2a

    Powerhouse 2a

    Visual Materials

    Powerhouse 2a. - Penstock anchor #4 near surge chamber at West. Portal.

    photCL SCE 02 - 14827

  • Image not available

    F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps

    Visual Materials

    Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.

    photCL SCE

  • F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    Visual Materials

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps. [Tunnel 3 - intake construction, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to carry sluicing water at outlet, surge chamber, Powerhouse 3 construction, installation of 3 penstocks, turbine and generator installations at PH #3, 220 kV switchyard.]

    photCL SCE 13 - vol 009