Visual Materials
Powerhouse 2a
- Description
- Powerhouse 2a. - Penstock anchor #4 near surge chamber at West. Portal.
- Date
- 2/23/1928
- Call number
- photCL SCE 02 - 14827
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Powerhouse 2a penstock - Looking uphill from the S. J. & E. RR crossing at West Portal Anchor #5, and the surge chamber alongside it. Anchor #5 still has the concrete forms on it.
photCL SCE 02 - 14829

Visual Materials
Powerhouse 2a penstock - Looking downhill along riveted portion of Penstock 2A just above the surge chamber at the outlet of tunnel No. 2.
photCL SCE 02 - 14897

Visual Materials
Powerhouse 2a - looking down the hill from West Portal along Penstock #2a.
photCL SCE 02 - 14825

Visual Materials
Powerhouse 2a - Looking downhill along penstock for Powerhouse 2A from the point above the S.J.E. & R.R. at West Portal. The pipe showing in the picture is the Ferrum banded. The concrete culvert enclosing the penstock is shown in the picture where the pipe passes through the culvert and under the SJ&E Railroad. .
photCL SCE 02 - 14896

Visual Materials
Powerhouse 2a - Looking towards the West Portal from a point below the outlet of the Shaver Tunnel along penstock 2a. Riveted pipe in this section.
photCL SCE 02 - 14900

Visual Materials
Portal Powerhouse - Outlet end and anchor on concrete overflow pipe from surge chamber.
photCL SCE 02 - 44819