Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Long Beach Steam Station No. 3


You might also be interested in

  • Image not available

    Long Beach Steam Station

    Visual Materials

    Long Beach Steam Station - Plant 3 operational shots, turbine maintenance & repairs, broken blades on turbine stages, deposits on turbine blades, and continued construction for second half of Plant 3.

    photCL SCE 13 - vol 093

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 construction, including superheater, header, boiler assembly, skylight over Turbo Room, flue opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.

    photCL SCE

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.

    photCL SCE

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Construction Photographs of Plant No. 3 at Long Beach Steam Station.

    photCL SCE

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Construction Photographs of Plant No. 3 at Long Beach Steam Station.

    photCL SCE

  • Image not available

    Long Beach Steam Station No. 2 and No. 3

    Visual Materials

    Condenser installation, stacks, south elevation poured, turbo installations, turbo room construction, boiler room construction, bricking the boilers, exterior shot complete with 8 stacks on Plant 2, control room. Piles placed for Plant 3 construction, moving above ground fuel storage tank by floating.

    photCL SCE