Visual Materials
Long Beach Steam Station No. 3
You might also be interested in
Image not available
Long Beach Steam Station No. 3
Visual Materials
Construction Photographs of Plant No. 3 at Long Beach Steam Station.
photCL SCE
Image not available
Long Beach Steam Station No. 3
Visual Materials
Long Beach Steam Station No. 3 operational shots, turbine maintenance and repairs, broken blades on turbine stages, deposits on turbine blades, and continued construction for second half of Plant 3.
photCL SCE
Image not available
Long Beach Steam Plant No. 2
Visual Materials
Construction Photographs of Plant No. 2 at Long Beach Steam Station. [Several of the 8x10 photographs in this album are labeled as "Plant No. 3" construction. These photographs are actually showing the four unit expansion of Plant No. 2. The first foundation pile for Plant No. 3 was driven on February 5, 1927.]
photCL SCE
Image not available
Long Beach Steam Plant No. 2
Visual Materials
Construction Photographs of Plant No. 2 at Long Beach Steam Station.
photCL SCE
Image not available
Long Beach Steam Plant No. 1
Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant No. 1, dismantling old Long Beach Gas Plant, foundation work for Unit No. 2.
photCL SCE
Image not available
Long Beach Steam Station No. 3
Visual Materials
Long Beach Steam Station No. 3 construction, including superheater, header, boiler assembly, skylight over Turbo Room, flue opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.
photCL SCE