    Condenser installation

    Visual Materials

    Condenser installation, stacks, south elevation poured, turbo installations, turbo room construction, boiler room construction, bricking the boilers, exterior shot complete with 8 stacks on Plant 2, control room. Piles placed for Plant 3 construction, moving above ground fuel storage tank by floating.

    photCL SCE 13 - vol 089

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.

    photCL SCE

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 construction, including superheater, header, boiler assembly, skylight over Turbo Room, flue opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.

    photCL SCE

  • Image not available

    Long Beach Steam Station

    Visual Materials

    Long Beach Steam Station - Plant 3 construction photos, turbo installation, Boiler #50, laying 15" gas main, to L.B.S.S., driving piles for Unit #11, take-off towers, towers at channel crossing, installing transformers and oil switches, Switching Garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab., fuel oil pump room, exciter, piles ready for steel.

    photCL SCE 13 - vol 092

  • Image not available

    Long Beach Steam Plant No. 1

    Visual Materials

    End of construction of Long Beach Steam Plant No. 1, including turbine installations, control rooms, transformers, cooling water system, plant start-up; Beginning construction for Plant No. 2, including excavation, driving piles for Plant 2 foundation.

    photCL SCE

  • Long Beach Steam Station, Plant #1

    Long Beach Steam Station, Plant #1

    Visual Materials

    Long Beach Steam Station, Plant #1 - Construction crew bricking up the boilers during the construction of Long Beach Steam Plant.