Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

F.P.C. Vol. 4, Projects 67 and 120 (copy 2)


You might also be interested in

  • Image not available

    F.P.C. Projects 67 and 120, Volume 3 (copy 2)

    Visual Materials

    Duplicate of F.P.C. Projects 67 and 120, Volume 3 (Box 9).

    photCL SCE

  • F.P.C. Vol. 4, Projects 67 & 120

    F.P.C. Vol. 4, Projects 67 & 120

    Visual Materials

    F.P.C. Vol. 4, Projects 67 & 120 - [Transportation - SJ&E RR near Auberry, incline railroads at PH #2, PH #3, & PH #8, Project 3 road construction, winter transportation, roads to Florence Lake and Tunnel project, trucks at Mono-Bear Siphon; Vincent Transmission Line construction; Stream gauging, Mammoth Pool dam site, Westside projects, PH8 Transmission Line; Big Creek - General Office, Machine Shop, Radio Room, Huntington Lake, Powerhouse 1, Boyleston Engineering office, Eagle Bell T/L, Lighthipe Substation, Long Beach Steam Station.]

    photCL SCE 13 - vol 010

  • Image not available

    F.P.C. Vol. 4, Projects 67 and 120

    Visual Materials

    Transportation, Vincent Transmission Line, and Stream gaging. San Joaquin and Eastern Railroad; Incline railroads at Big Creek Powerhouse No. 2, Powerhouse No. 3, and Powerhouse No. 8, Project 3 road construction in San Joaquin Canyon; winter transportation service, road construction for Florence Lake and Tunnel project; Trucks at Mono-Bear siphon; Vincent Transmission Line construction; Stream gauging; Mammoth Pool dam site; Westside projects, Powerhouse 8 Transmission Line; Views of Big Creek general office, machine shop, and radio room; Huntington Lake; Big Creek Powerhouse No. 1 and penstocks; Boylston Street drafting room during the peak of Big Creek construction; Eagle-Bell transmission line; Long Beach Steam Station.

    photCL SCE

  • F.P.C. Vol 1, Projects 67 & 120 - Construction Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion

    F.P.C. Vol 1, Projects 67 & 120 - Construction Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion

    Visual Materials

    F.P.C. Vol 1, Projects 67 & 120 - Construction Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion. [diamond drilling, crib dam, forms, intake, tunnel excavation; Mono Dam construction, Mono-Bear junction, Mono-Bear Siphon.]

    photCL SCE 13 - vol 008

  • Image not available

    F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps

    Visual Materials

    Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.

    photCL SCE

  • F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    Visual Materials

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps. [Tunnel 3 - intake construction, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to carry sluicing water at outlet, surge chamber, Powerhouse 3 construction, installation of 3 penstocks, turbine and generator installations at PH #3, 220 kV switchyard.]

    photCL SCE 13 - vol 009