F.P.C. Vol. 4, Projects 67 & 120
You might also be interested in
Image not available
F.P.C. Vol. 4, Projects 67 and 120
Visual Materials
Transportation, Vincent Transmission Line, and Stream gaging. San Joaquin and Eastern Railroad; Incline railroads at Big Creek Powerhouse No. 2, Powerhouse No. 3, and Powerhouse No. 8, Project 3 road construction in San Joaquin Canyon; winter transportation service, road construction for Florence Lake and Tunnel project; Trucks at Mono-Bear siphon; Vincent Transmission Line construction; Stream gauging; Mammoth Pool dam site; Westside projects, Powerhouse 8 Transmission Line; Views of Big Creek general office, machine shop, and radio room; Huntington Lake; Big Creek Powerhouse No. 1 and penstocks; Boylston Street drafting room during the peak of Big Creek construction; Eagle-Bell transmission line; Long Beach Steam Station.
photCL SCE

F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps
Visual Materials
F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps. [Tunnel 3 - intake construction, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to carry sluicing water at outlet, surge chamber, Powerhouse 3 construction, installation of 3 penstocks, turbine and generator installations at PH #3, 220 kV switchyard.]
photCL SCE 13 - vol 009

F.P.C. Vol 1, Projects 67 & 120 - Construction Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion
Visual Materials
F.P.C. Vol 1, Projects 67 & 120 - Construction Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion. [diamond drilling, crib dam, forms, intake, tunnel excavation; Mono Dam construction, Mono-Bear junction, Mono-Bear Siphon.]
photCL SCE 13 - vol 008
Image not available
F.P.C. Vol. 4, Projects 67 and 120 (copy 2)
Visual Materials
Duplicate of F.P.C. Vol. 4 but missing several pages.
photCL SCE
Image not available
F.P.C. Projects 67 and 120, Volume 3 (copy 2)
Visual Materials
Duplicate of F.P.C. Projects 67 and 120, Volume 3 (Box 9).
photCL SCE
Image not available
F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps
Visual Materials
Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.
photCL SCE