Visual Materials
F.P.C. Vol 1, Projects 67 & 120 - Construction Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion
You might also be interested in
Image not available
F.P.C. Vol. 1, Projects 67 and 120 - Construction of Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion
Visual Materials
Florence Reservoir, Florence Tunnel, and Mono-Bear. Views include Big Creek Canyon; Florence Lake Dam site, including diamond drilling, clearing site, crib dam; Florence Lake Dam construction, forms construction; Florence Tunnel intake, tunnel excavation; Mono Dam construction: Mono-Bear junction; Mono-Bear siphon construction.
photCL SCE

F.P.C. Vol. 4, Projects 67 & 120
Visual Materials
F.P.C. Vol. 4, Projects 67 & 120 - [Transportation - SJ&E RR near Auberry, incline railroads at PH #2, PH #3, & PH #8, Project 3 road construction, winter transportation, roads to Florence Lake and Tunnel project, trucks at Mono-Bear Siphon; Vincent Transmission Line construction; Stream gauging, Mammoth Pool dam site, Westside projects, PH8 Transmission Line; Big Creek - General Office, Machine Shop, Radio Room, Huntington Lake, Powerhouse 1, Boyleston Engineering office, Eagle Bell T/L, Lighthipe Substation, Long Beach Steam Station.]
photCL SCE 13 - vol 010

F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps
Visual Materials
F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps. [Tunnel 3 - intake construction, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to carry sluicing water at outlet, surge chamber, Powerhouse 3 construction, installation of 3 penstocks, turbine and generator installations at PH #3, 220 kV switchyard.]
photCL SCE 13 - vol 009
Image not available
F.P.C. Vol. 4, Projects 67 and 120
Visual Materials
Transportation, Vincent Transmission Line, and Stream gaging. San Joaquin and Eastern Railroad; Incline railroads at Big Creek Powerhouse No. 2, Powerhouse No. 3, and Powerhouse No. 8, Project 3 road construction in San Joaquin Canyon; winter transportation service, road construction for Florence Lake and Tunnel project; Trucks at Mono-Bear siphon; Vincent Transmission Line construction; Stream gauging; Mammoth Pool dam site; Westside projects, Powerhouse 8 Transmission Line; Views of Big Creek general office, machine shop, and radio room; Huntington Lake; Big Creek Powerhouse No. 1 and penstocks; Boylston Street drafting room during the peak of Big Creek construction; Eagle-Bell transmission line; Long Beach Steam Station.
photCL SCE

Big Creek - Mono-Bear and Huntington-Shaver diversions
Visual Materials
Big Creek - Mono-Bear and Huntington-Shaver diversions [Construction of Bear Creek Dam & intake structure, and Mono Creek Dam & intake structure, logging area for Mono Creek reservoir, pipeline crossing south fork of San Joaquin River, Camps 71, 72, 73, 80, 81, 82, 83, and 85; Mono-Bear Siphon, back-filled siphon & pipeline, tunnels, pipeline installations, outlets of Mono and Bear Tunnels, intake of Bear Tunnel at Camp 86, Intake of Mono tunnel, Big Creek Siphon, duplex valve on Huntington-Pitman-Shaver conduit & tunnel, intake for conduit at Dam 2, Warehouse, Mess hall and Hospital at Camp 73.]
photCL SCE 13 - vol 038
Image not available
F.P.C. Projects 67 and 120, Volume 3 (copy 2)
Visual Materials
Duplicate of F.P.C. Projects 67 and 120, Volume 3 (Box 9).
photCL SCE