Views of Bear Dam, Mono Dam, Mono-Bear pipelines and diversions, and Huntington -Shaver diversions. Construction of Bear Creek Dam and intake structure, and Mono Creek Dam and intake structure, logging area for Mono Creek reservoir, pipeline crossing south fork of San Joaquin River, Camps 71, 72, 73, 80, 81, 82, 83, and 85; Mono-Bear siphon, backfilled siphon and pipeline, tunnels, pipeline installations, outlets of Mono and Bear Tunnels, intake of Bear Tunnel at Camp 86, Intake of Mono tunnel, Big Creek siphon, duplex valve on Huntington-Pitman-Shaver conduit and tunnel, intake for conduit at Dam 2, Warehouse, Mess hall and Hospital at Camp 73.
photCL SCE

Visual Materials
Big Creek, Mono-Bear Diversion - Mono-Bear Siphon - Mono Flow Line - Looking downstream from intake.
photCL SCE 02 - 23391

Visual Materials
Big Creek, Mono-Bear Diversion - Outlet portal of short tunnel on Mono Bear Siphon just below the outlets of the Mono and Bear Tunnels.
photCL SCE 02 - 14384

Visual Materials
F.P.C. Vol 1, Projects 67 & 120 - Construction Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion. [diamond drilling, crib dam, forms, intake, tunnel excavation; Mono Dam construction, Mono-Bear junction, Mono-Bear Siphon.]
photCL SCE 13 - vol 008

Visual Materials
Big Creek, Mono-Bear Diversion - Mono Bear - Camp 86 - Intake on Bear Tunnel - note contour at 7350.
photCL SCE 02 - 14329

Visual Materials
Big Creek, Mono-Bear Diversion - Looking downstream at Mono Creek Dam and intake. The reflection in the water gives the middle of the pond the appearance of being something like a tunnel dump.
photCL SCE 02 - 14767