Visual Materials
Construction of Transmission Lines of Northern Capistrano
You might also be interested in
Image not available
Construction of Barre-Lighthipe Transmission Line and others
Visual Materials
Construction of Barre-Lighthipe Transmission Line; Eagle Rock-Gould Transmission Line [replacing single circuit towers with double-circuit towers]; Chino-Laguna Bell transmission line; Pisgah Substation construction, and Boulder-Chino transmission line.
photCL SCE
Image not available
Construction Photos: Hayfield
Visual Materials
Construction Photos: Hayfield-Chino Transmission Line, Boulder-Chino T/L, and Chino-Capistrano T/L.
photCL SCE 13 - vol 106

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - sandy wash.
photCL SCE 02 - 26648

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - Proposed line Fargo Canyon & Double Canyon.
photCL SCE 02 - 26650

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - Proposed line Fargo Canyon & Double Canyon.
photCL SCE 02 - 26651

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - Gravel pit near Burial Mt.
photCL SCE 02 - 26649