Visual Materials
Construction of Barre-Lighthipe Transmission Line and others
You might also be interested in
Image not available
Construction on: Barre
Visual Materials
Construction on: Barre-Lighthipe Transmission Line; Eagle Rock-Gould T/L [replacing single circuit towers with double-circuit towers]; Chino-Laguna Bell T/L - assembling Tower steel, road building, pouring concrete footings, use of "floating" Gin Pole at M5-T1; Pisgah Substation construction - Camp 4, material yard, 2nd Boulder-Chino T/L, control house, operator's cottage.
photCL SCE 13 - vol 105
Image not available
Transmission lines: Vincent, Lighthipe-Chino, Long Beach, Big Tujunga
Visual Materials
Transmission Lines, including Brea Camp on the Lighthipe-Chino 66kV transmission line, mess hall, kitchen, hospital tent; Long Beach-Lighthipe-Laguna Bell transmission line, including multi-circuit tower construction, driving piles for tower foundations, collapsed Long Beach transmission line tower; Vincent 220kV transmission line, including road building, Construction Camps 2, 3, 6, 8, 9, and 10, Camp 6 kitchen and mess hall, Maple Canyon, Big Tujunga, transporting tower materials, tractors pulling graders, pack trains, building towers, pulling cable, cable splicing.
photCL SCE

Barre-Lighthipe Transmission Line - Chino-Capistrano Line
Visual Materials
Barre-Lighthipe Transmission Line - Chino-Capistrano Line - Driving foundation piles about M7. [Photocard marked Barre-Lighthipe Line, logbook records Chino-Capistrano]
photCL SCE 02 - 23206

Barre-Lighthipe Transmission Line
Visual Materials
Barre-Lighthipe Transmission Line - tower construction at Barre Substation M15-T4.
photCL SCE 02 - 23282

Barre-Lighthipe Transmission Line
Visual Materials
Barre-Lighthipe Transmission Line - Construction alongside M. C. Transmission Lines.
photCL SCE 02 - 23536

Barre-Lighthipe Transmission Line
Visual Materials
Barre-Lighthipe Transmission Line - Looking north from Barre Substation.
photCL SCE 02 - 23290