Visual Materials
Construction on: Barre
- Description
- Construction on: Barre-Lighthipe Transmission Line; Eagle Rock-Gould T/L [replacing single circuit towers with double-circuit towers]; Chino-Laguna Bell T/L - assembling Tower steel, road building, pouring concrete footings, use of "floating" Gin Pole at M5-T1; Pisgah Substation construction - Camp 4, material yard, 2nd Boulder-Chino T/L, control house, operator's cottage.
- Date
- 1940 to 1942
- Call number
- photCL SCE 13 - vol 105



