Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Construction Photos: Hayfield



You might also be interested in

  • Image not available

    Construction of Transmission Lines of Northern Capistrano

    Visual Materials

    Construction of Hayfield-Chino Transmission Line, Boulder-Chino Transmission Line, Chino-Capistrano transmission line.

    photCL SCE

  • Image not available

    Construction on: Barre

    Visual Materials

    Construction on: Barre-Lighthipe Transmission Line; Eagle Rock-Gould T/L [replacing single circuit towers with double-circuit towers]; Chino-Laguna Bell T/L - assembling Tower steel, road building, pouring concrete footings, use of "floating" Gin Pole at M5-T1; Pisgah Substation construction - Camp 4, material yard, 2nd Boulder-Chino T/L, control house, operator's cottage.

    photCL SCE 13 - vol 105

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - sandy wash.

    photCL SCE 02 - 26648

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - Proposed line Fargo Canyon & Double Canyon.

    photCL SCE 02 - 26650

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - Proposed line Fargo Canyon & Double Canyon.

    photCL SCE 02 - 26651

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - Gravel pit near Burial Mt.

    photCL SCE 02 - 26649