Visual Materials
Proposed re-arrangement of P.M.S.S. Peru : lengthened 50 ft. in way of Fire Room
- Description
- "Proposed re-arrangement of P.M.S.S. Peru : lengthened 50 ft. in way of Fire Room"--title at top of sheet. The drawing shows a profile and the six decks of the Peru . "1/16" = 1 foot"--scale given. In the lower right hand corner is a case/sheet number, "1464-42149." "Peru"--on verso, in ms., in pencil. "Don"--on verso, in ms., in red pencil. Unknown as to when the copy was made. The Peru operated for Pacific Mail between 1892 and 1919; built for PMSSCO by Union Iron Works in 1891-92; she was the second Pacific Mail vessel to carry this name. Focus of item: Peru (1892-1919).
- Date
- s.d., 1903 January 23
- Call number
- priJHK 00147





![P.M.S.S. [City of] Peking : general arrangement](/_next/image?url=https%3A%2F%2Frail.huntington.org%2FIIIF3%2FImage%2F22APN4ZN1Z2T%2Ffull%2F%5E360%2C%2F0%2Fdefault.jpg&w=750&q=75)