Visual Materials
Big Creek #4 project: Shot looking down on Dam 7, over half complete, with red flowers in the foreground
You might also be interested in

Big Creek #4 project: Shot looking at Dam 7
Visual Materials
Big Creek #4 project: Shot looking at Dam 7 - over half complete from the riverbed, upstream of dam. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
photCL SCE 10 - 00091

Big Creek #4 project: Shot looking at Dam 7, almost complete looking up from the riverbed, downstream of dam
Visual Materials
Big Creek #4 project: Shot looking at Dam 7, almost complete looking up from the riverbed, downstream of dam. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
photCL SCE 10 - 00092

Big Creek #4 project: Construction shot of Penstock running down slope to Powerhouse #4
Visual Materials
Big Creek #4 project: Construction shot of Penstock running down slope to Powerhouse #4. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
photCL SCE 10 - 00097

Big Creek #4 project: Dam 7
Visual Materials
Big Creek #4 project: Dam 7 - first stages of construction (looking down) - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
photCL SCE 10 - 00088

Big Creek #4 project: Shot of downstream face of Dam 7
Visual Materials
Big Creek #4 project: Shot of downstream face of Dam 7, head-on at crest level. Dam is almost complete, but gates have not been installed yet. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
photCL SCE 10 - 00094

Big Creek #4 project: Dam 7
Visual Materials
Big Creek #4 project: Dam 7 -1/3 complete (with a field of Owl's Clover in the foreground). - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
photCL SCE 10 - 00089