Visual Materials
Big Creek #4 project: Shot of downstream face of Dam 7
- Description
- Big Creek #4 project: Shot of downstream face of Dam 7, head-on at crest level. Dam is almost complete, but gates have not been installed yet. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
- Date
- circa 1950
- Call number
- photCL SCE 10 - 00094






