Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek #4 project: Construction shot of Penstock running down slope to Powerhouse #4



You might also be interested in

  • Big Creek #4 project: Construction shot inside Powerhouse #4.  Workers are assembling one of the vertical axis, Francis turbine-

    Big Creek #4 project: Construction shot inside Powerhouse #4. Workers are assembling one of the vertical axis, Francis turbine-

    Visual Materials

    Big Creek #4 project: Construction shot inside Powerhouse #4. Workers are assembling one of the vertical axis, Francis turbine-generators. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.

    photCL SCE 10 - 00098

  • Big Creek #4 project: Shot looking at Dam 7

    Big Creek #4 project: Shot looking at Dam 7

    Visual Materials

    Big Creek #4 project: Shot looking at Dam 7 - over half complete from the riverbed, upstream of dam. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.

    photCL SCE 10 - 00091

  • Big Creek #4 project: Shot looking down on Dam 7, over half complete, with red flowers in the foreground

    Big Creek #4 project: Shot looking down on Dam 7, over half complete, with red flowers in the foreground

    Visual Materials

    Big Creek #4 project: Shot looking down on Dam 7, over half complete, with red flowers in the foreground. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.

    photCL SCE 10 - 00090

  • Big Creek #4 project: Shot of downstream face of Dam 7

    Big Creek #4 project: Shot of downstream face of Dam 7

    Visual Materials

    Big Creek #4 project: Shot of downstream face of Dam 7, head-on at crest level. Dam is almost complete, but gates have not been installed yet. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.

    photCL SCE 10 - 00094

  • Big Creek #4 project: Shot looking at Dam 7, almost complete looking up from the riverbed, downstream of dam

    Big Creek #4 project: Shot looking at Dam 7, almost complete looking up from the riverbed, downstream of dam

    Visual Materials

    Big Creek #4 project: Shot looking at Dam 7, almost complete looking up from the riverbed, downstream of dam. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.

    photCL SCE 10 - 00092

  • Big Creek #4 project: Rock quarry

    Big Creek #4 project: Rock quarry

    Visual Materials

    Big Creek #4 project: Rock quarry - men preparing to dynamite. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.

    photCL SCE 10 - 00087