Visual Materials
At the corner of State and Victoria Streets, across the road from the Arlington Hotel, rose the tallest of Santa Barbara's electric light masts, a 150-foot cable-reinforced iron pipe tower, the base of which can be seen at the right of the photo
You might also be interested in

Preparing to pull through some more cable during the construction of a 500kV transmission line
Visual Materials
Preparing to pull through some more cable during the construction of a 500kV transmission line. Pg. 222.
photCL SCE 11 - 00448

These Mack Bulldogs are at the foot of the Kaiser Pass Road at Huntington Lake, laden with pipe for the Mono-Bear Siphon near Florence Lake
Visual Materials
These Mack Bulldogs are at the foot of the Kaiser Pass Road at Huntington Lake, laden with pipe for the Mono-Bear Siphon near Florence Lake. Heavy snows kept this road closed much of the year, limiting truck travel to the brief summer months. Pg. 115.
photCL SCE 11 - 00233

Making a splice in the aluminum and steel cable during construction of the tower line over Cajon Pass in May of 1912
Visual Materials
Making a splice in the aluminum and steel cable during construction of the tower line over Cajon Pass in May of 1912. Pg. 79.
photCL SCE 11 - 00164

Highly saline geothermal fluids are run through complex piping to extract steam to generate 10,000 kilowatts of electricity at the Brawley Geothermal Plant
Visual Materials
Highly saline geothermal fluids are run through complex piping to extract steam to generate 10,000 kilowatts of electricity at the Brawley Geothermal Plant. Pg. 239.
photCL SCE 11 - 00484

Skilled workmen install the last segment of German-made penstock pipe at Big Creek #1 Hydro Plant
Visual Materials
Skilled workmen install the last segment of German-made penstock pipe at Big Creek #1 Hydro Plant. When completed, the pipeline had the longest and steepest drop from reservoir to water wheel of any power house in the world. Pg. 100.
photCL SCE 11 - 00203