Line crew of 4 CEP workers splicing aluminum steel cable in the desert.
photCL SCE 07 - 00104

Visual Materials
One tower of Edison's growing network of 500kV transmission lines stands sentinel in Cajon Pass in the winter of 1973. Pg. 226.
photCL SCE 11 - 00457

Visual Materials
Miscellaneous Transmission - New method of splicing 220 kVA aluminum cable. - Field splice of aluminum conductor on the Vincent T/L; showing the inner steel sleeve which has been completely compressed over the abutting ends of the stranded steel core forming the interior part of the conductor, and the pouring of a corrosion resistant compound, to be followed by an aluminum wrapping and thereafter the aluminum outer sleeve seen at the right edge of the photo which will be slipped over the splice section and compressed to complete the splice.
photCL SCE 02 - 11539

Visual Materials
Stringing wire on the Mira Loma-Lugo 500 kV transmission line in Cajon Pass, 1979. Pg. 222.
photCL SCE 11 - 00446

Visual Materials
Preparing to pull through some more cable during the construction of a 500kV transmission line. Pg. 222.
photCL SCE 11 - 00448

Visual Materials
Miscellaneous Transmission - Santa Barbara steel tower line construction - Angle tower. [2 views a & b]
photCL SCE 02 - 10421