Visual Materials
Making a splice in the aluminum and steel cable during construction of the tower line over Cajon Pass in May of 1912. Pg. 79.
photCL SCE 11 - 00164

Visual Materials
Miscellaneous Transmission - New method of splicing 220 kVA aluminum cable. - Field splice of aluminum conductor on the Vincent T/L; showing the inner steel sleeve which has been completely compressed over the abutting ends of the stranded steel core forming the interior part of the conductor, and the pouring of a corrosion resistant compound, to be followed by an aluminum wrapping and thereafter the aluminum outer sleeve seen at the right edge of the photo which will be slipped over the splice section and compressed to complete the splice.
photCL SCE 02 - 11539

Visual Materials
Distribution line in desert with empty cable spools on ground
photCL SCE 07 - 00895

Visual Materials
Permanente Line Poles - CEP Line crew group photo with poles on truck
photCL SCE 07 - 00562

Visual Materials
Working over 150 feet above the desert floor, an Edison crew assembles a tower for the Vincent-Lugo transmission line. Pg. 223
photCL SCE 11 - 00450

Visual Materials
Steel tower line in the forest - Copperweld [with 4 variants]
photCL SCE 06 - 70450