Visual Materials
One tower of Edison's growing network of 500kV transmission lines stands sentinel in Cajon Pass in the winter of 1973
You might also be interested in

Dramatic view of the building of the Vincent-Lugo 500kV transmission line, part of Edison's bulk power "backbone"
Visual Materials
Dramatic view of the building of the Vincent-Lugo 500kV transmission line, part of Edison's bulk power "backbone". Pg. 224.
photCL SCE 11 - 00451

A substation maintenance man stands beside one of the new 500kV air circuit breakers at Vincent Substation
Visual Materials
A substation maintenance man stands beside one of the new 500kV air circuit breakers at Vincent Substation. Pg. 224.
photCL SCE 11 - 00452

Stringing wire on the Mira Loma-Lugo 500 kV transmission line in Cajon Pass, 1979
Visual Materials
Stringing wire on the Mira Loma-Lugo 500 kV transmission line in Cajon Pass, 1979. Pg. 222.
photCL SCE 11 - 00446

Making a splice in the aluminum and steel cable during construction of the tower line over Cajon Pass in May of 1912
Visual Materials
Making a splice in the aluminum and steel cable during construction of the tower line over Cajon Pass in May of 1912. Pg. 79.
photCL SCE 11 - 00164

Edison Company linemen use a "shepherd's hook" tool to install a 500kV insulator on a Pacific Intertie tower
Visual Materials
Edison Company linemen use a "shepherd's hook" tool to install a 500kV insulator on a Pacific Intertie tower. Pg. 225.
photCL SCE 11 - 00455

Preparing to pull through some more cable during the construction of a 500kV transmission line
Visual Materials
Preparing to pull through some more cable during the construction of a 500kV transmission line. Pg. 222.
photCL SCE 11 - 00448