Dramatic view of the building of the Vincent-Lugo 500kV transmission line, part of Edison's bulk power "backbone". Pg. 224.
photCL SCE 11 - 00451

Visual Materials
Making a splice in the aluminum and steel cable during construction of the tower line over Cajon Pass in May of 1912. Pg. 79.
photCL SCE 11 - 00164

Visual Materials
Edison Company linemen use a "shepherd's hook" tool to install a 500kV insulator on a Pacific Intertie tower. Pg. 225.
photCL SCE 11 - 00455

Visual Materials
A substation maintenance man stands beside one of the new 500kV air circuit breakers at Vincent Substation. Pg. 224.
photCL SCE 11 - 00452

Visual Materials
Stringing wire on the Mira Loma-Lugo 500 kV transmission line in Cajon Pass, 1979. Pg. 222.
photCL SCE 11 - 00446

Visual Materials
Preparing to pull through some more cable during the construction of a 500kV transmission line. Pg. 222.
photCL SCE 11 - 00448