Visual Materials
Skilled workmen install the last segment of German-made penstock pipe at Big Creek #1 Hydro Plant
You might also be interested in

The installed siphon pipe at Kaweah #3 Hydro Plant
Visual Materials
The installed siphon pipe at Kaweah #3 Hydro Plant, showing rock formations surrounding the pipe, ca. 1913.
photCL SCE 04 - 00180

The penstock at the head of the pipe line at Kaweah #2 Hydro Plant
Visual Materials
The penstock at the head of the pipe line at Kaweah #2 Hydro Plant, November 10, 1904. An operator is standing at the top.
photCL SCE 04 - 00072

A micro-hydro installation: this 30 kilowatt generator was added to existing pipes in the Avalon water system operated by Edison
Visual Materials
A micro-hydro installation: this 30 kilowatt generator was added to existing pipes in the Avalon water system operated by Edison. Pg. 237.
photCL SCE 11 - 00478

A construction crew probably working on one of the adits at Ward Tunnel at Big Creek Hydro Plant
Visual Materials
A construction crew probably working on one of the adits at Ward Tunnel at Big Creek Hydro Plant. Pg. 6.
photCL SCE 11 - 00502

The tramway being moved during the construction of Santa Ana River #1 Hydro Plant so that the penstock and pipes could be installed
Visual Materials
The tramway being moved during the construction of Santa Ana River #1 Hydro Plant so that the penstock and pipes could be installed.
photCL SCE 01 - 00526