Visual Materials
The tramway being moved during the construction of Santa Ana River #1 Hydro Plant so that the penstock and pipes could be installed
You might also be interested in

The installation of the penstock during the construction of Mill Creek #3 Hydro Plant
Visual Materials
The installation of the penstock during the construction of Mill Creek #3 Hydro Plant, showing the mountains in the background.
photCL SCE 01 - 00113

A construction crew at the end of the tramway at Kaweah #3 Hydro Plant
Visual Materials
A construction crew at the end of the tramway at Kaweah #3 Hydro Plant, showing construction materials and pipes with the mountains in the background, ca. 1913. There is a number written on the side of the negative in an unusual manner.
photCL SCE 04 - 00159

Pipes for the pipe-line at Kaweah #2 Hydro Plant
Visual Materials
Pipes for the pipe-line (penstock?) at Kaweah #2 Hydro Plant, June 12, 1904.
photCL SCE 04 - 00237

A general view of the Santa Ana River #1 Hydro Plant
Visual Materials
A general view of the Santa Ana River #1 Hydro Plant [showing the penstock, the tailrace, the company houses, and the power house]
photCL SCE 01 - 00536

A construction crew and mule in a winter storm during the construction of Santa Ana River #1 Hydro Plant
Visual Materials
A construction crew and mule in a winter storm during the construction of Santa Ana River #1 Hydro Plant, ca. 1898.
photCL SCE 01 - 00528

The construction crew working on the construction of Santa Ana River #1 Hydro Plant
Visual Materials
The construction crew working on the construction of Santa Ana River #1 Hydro Plant.
photCL SCE 01 - 00027