Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Visual Materials
Mount Whitney Power Company album including views of the Visalia office, Courthouse, Carnegie Library, High School, Spaulding home; Tulare Substation; Porterville substation, waterworks, town, agriculture, packing houses; Exeter Substation, Packing House, Hotel; Tule River; Lindsay orange orchard and pumping plant, waterworks, transmission line; Lemon Cove; Kaweah Powerhouse No. 1, Intake, flume, Dam and intake for Plant 2, Flume 1 for plant 2, canal, poor flume construction, reservoir, pipeline, penstock, Plant 2 construction, dam construction and photographs at Monarch Lake, Lady Franklin Lake, Silver Lake and Eagle Lake.
photCL SCE

Visual Materials
Lindsay Substation; Delano Substation; Visalia Steam Plant; Kaweah #1 - flume, cottages, powerhouse, switchboard; Kaweah #2 Powerhouse, Kaweah #3 - construction of flumes, tunnels, canals, diversion dam & intake, regulating reservoir/forebay, canal repairs, sandbox, steel pipeline, siphon, penstock, incline RR, Powerhouse 3 ; Wolverton; Visalia Garage; Tulare Substation & Waterworks; const. MWP Co. General Office in Visalia; Tule diversion dam & Intake, Marble Fork Camp, construction of Tule flumes, canals, forebay, and Tule Powerhouse.
photCL SCE 13 - vol 114

Visual Materials
Silver Lake, Kaweah Powerhouse #2, waste gate on flume, canal; Kaweah PH #3 (exterior & interior), switchboard, Kaweah 3 dam, intake, conduit, waste gate & sand trap, construction of Kaweah 3 regulating reservoir; Tule Powerhouse (exterior & interior), Tule conduit, sand trap, flume; Visalia Steam Plant, Boiler Room; Tulare Steam Plant, switchboard; Substations - Tulare, Venice Hill, Tipton, Terra Bella, Delano, Exeter, Lindsay, Porterville, Success, Sugar, Packwood, Woodville, Earlimart, Strathmore, and Saucelito; Visalia Garage, Visalia Office - MWP Co.; Tulare Office & Storeroom.
photCL SCE 13 - vol 113
Image not available
Visual Materials
Azusa Line; Big Creek construction - Dam 2, towers, Powerhouse 2, Richgrove Patrol Sta.; Borel change to Pelton-Francis horizontal turbines, break in canal, Bodfish Flume, repairs at Schoolhouse Cut, Profanity Flume; San Bernardino "C" Street Sub., Long Beach Steam Plant, Santa Ana River 2; Fillmore Sub.; PL&P trucks & wagons; Huntington Beach Sub.; East Kern Line; Kern Canal, settling basin, Borel Powerhouse; Mentone - siphon, flume break, fish screen, intake; L.A. City Power Dev. Plant 1; Pedley Powerhouse - break in canal; Redondo Steam Plant; Sierra Powerhouse; Stone Castle, Vernon Sub., Santa Paula Sub., Monolith Sub., and Eagle Rock Substation.
photCL SCE 13 - vol 096

Visual Materials
Photos of Borel flume and canal work (mostly un-numbered), Borel headworks, Borel Powerhouse, Kern River #3 construction, Santa Ana River #1 powerhouse, SAR 1 intake, SAR 1 settling basin, SAR #2 powerhouse, Mill Creek #1 Powerhouse, Mill Creek #3 intake, Mill Creek cottages, SAR #3 flume construction, PL&P construction photos from 1903, Bear Valley Dam (Union Power Co.), Mill Creek 2&3 Powerhouse, SAR flood damage.
photCL SCE 13 - vol 073

Visual Materials
The dam and intake at Kaweah #2 Hydro Plant.
photCL SCE 04 - 00733