Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Visual Materials
Lindsay Substation; Delano Substation; Visalia Steam Plant; Construction of Kaweah No. 1, No. 2, and Kaweah No. 3; Wolverton; Visalia Garage; Tulare Substation and Waterworks; Mount Whitney Power Co. general office in Visalia; Tule diversion dam and Intake, Marble Fork Camp, and construction of Tule flumes, canals, forebay, and powerhouse.
photCL SCE

Visual Materials
Visalia - MWP Co. Office, Courthouse, Carnegie Library, High School, Spaulding home; Tulare Substation; Porterville - Sub., waterworks, town, agriculture, packing houses; Exeter - Sub., Packing House, Hotel; Tule River; Lindsay - Orange orchard & pumping plant, waterworks, transmission line; Kaweah Hydro - Powerhouse #1, Intake, flume, Dam & intake for Plant 2, Flume 1 for plant 2, canal, photos of poor flume construction, reservoir, pipeline, penstock, Plant 2 construction, Dam construction and photos at Monarch, Lady Franklin, Silver, and Eagle Lakes.
photCL SCE 13 - vol 100
Image not available
Visual Materials
Intake 2, Dam construction at Lake Sabrina and South Lake, Plant 2 and cottages, Plant 4, recreation building, Plant 5, Silver Peak Substation, Las Vegas train station and surrounding town.
photCL SCE
Image not available
Visual Materials
Photographs of Rhyolite Substation, Temescal Rock Company Substation, Banning Substation; Bishop Creek hydroelectric Plant No. 2, No. 3, No. 4, No. 5; Reservoir No. 1 [South Lake or Lake Sabrina], Equalizing Reservoir [Intake 2] showing proposed position of Plant No. 1, Control Station, and Cottages; Substations and Transmission Lines, including Victorville, Ransburg, Tonopah, Goldfield, Alkali, Manhattan, Elsinore, El Centro, and San Bernardino; Otay Dam and Reservoir.
photCL SCE
Image not available
Visual Materials
Intake 2 Reservoir on North Fork Bishop Creek, Dam site - Reservoir No. 2, Lake on Middle Fork of Bishop Creek (Reservoir No. 1), dam site Reservoir No. 1, dam and intake, wood stave flowline, construction of a Bishop Creek Powerhouse [looks like Plant No. 4].
photCL SCE
Image not available
Visual Materials
Azusa Line; Big Creek construction - Dam 2, towers, Powerhouse 2, Richgrove Patrol Sta.; Borel change to Pelton-Francis horizontal turbines, break in canal, Bodfish Flume, repairs at Schoolhouse Cut, Profanity Flume; San Bernardino "C" Street Substation, Long Beach Steam Plant, Santa Ana River 2; Fillmore Substation; PLandP trucks and wagons; Huntington Beach Substation; East Kern Line; Kern Canal, settling basin, Borel Powerhouse; Mentone - siphon, flume break, fish screen, intake; L.A. City Power Dev. Plant 1; Pedley Powerhouse - break in canal; Redondo Steam Plant; Sierra Powerhouse; Stone Castle, Vernon Substation, Santa Paula Substation, Monolith Substation, and Eagle Rock Substation.
photCL SCE