Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Vermilion Dam - Drilling 16" 0 vertical drain.
photCL SCE 02 - 44730

Visual Materials
Big Creek, Vermilion Dam - Excavating toe drains on downstream side of dam.
photCL SCE 02 - 44139

Visual Materials
Big Creek, Vermilion Dam - Fill over toe drains downstream.
photCL SCE 02 - 44310

Visual Materials
Big Creek, Vermilion Dam - Concrete drainage from Toe Drains.
photCL SCE 02 - 44333

Visual Materials
Big Creek, Vermilion Dam - Portable Grizzly for producing cobble for drains.
photCL SCE 02 - 44251

Visual Materials
Big Creek, Vermilion Dam - Fill over conduit and downstream Toe Drains.
photCL SCE 02 - 44336