Visual Materials
Big Creek, Vermilion Dam
- Description
- Big Creek, Vermilion Dam - Excavating toe drains on downstream side of dam.
- Date
- 7/21/1953
- Call number
- photCL SCE 02 - 44139
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Vermilion Dam - Fill over toe drains downstream.
photCL SCE 02 - 44310

Visual Materials
Big Creek, Vermilion Dam - Fill over conduit and downstream Toe Drains.
photCL SCE 02 - 44336

Visual Materials
Big Creek, Vermilion Dam - Concrete drainage from Toe Drains.
photCL SCE 02 - 44333

Visual Materials
Big Creek, Vermilion Dam - Lateral drains at upper end of auxiliary toe drain.
photCL SCE 02 - 44705

Visual Materials
Big Creek, Vermilion Dam - Lateral drains at upper end of auxiliary toe drain.
photCL SCE 02 - 44720

Visual Materials
Big Creek, Vermilion Dam - Preparation of sub grade for concrete pipe from Toe Drains.
photCL SCE 02 - 44334