Visual Materials
Big Creek, Vermilion Dam - Shallow drain potter used in draining damp area adjacent to toe of dam at west end. 18" blanket of tunnel muck over drains.
photCL SCE 02 - 44777

Visual Materials
Big Creek, Vermilion Dam - Flow of water from spillway channel. Source is a subteranian stream emergency from north side - approximately 15-20 below natural ground & approximately same distance east of toe drain at end of pipe in auxiliary drain #2.
photCL SCE 02 - 44731

Visual Materials
Big Creek, Vermilion Dam - Slope at Sta[tion] 9+00, opposite upper toe drain outlet. Typical erosion.
photCL SCE 02 - 44363

Visual Materials
Big Creek, Vermilion Dam - Upper toe drain outlet (before weir plate installation)
photCL SCE 02 - 42960

Visual Materials
Big Creek, Vermilion Dam - Excavation operation at junction of intermediate drain and toe drain.
photCL SCE 02 - 44272

Visual Materials
Big Creek, Vermilion Dam - Blanketing fine sand area at junction of Toe Drain and Intermediate Drain.
photCL SCE 02 - 44292