Big Creek, Vermilion Dam
- Description
- Big Creek, Vermilion Dam - Portable Grizzly for producing cobble for drains.
- Date
- 9/25/1953
- Call number
- photCL SCE 02 - 44251
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Vermilion Dam - Preparation of sub grade for concrete pipe from Toe Drains.
photCL SCE 02 - 44334

Visual Materials
Big Creek, Vermilion Dam - Cobble fingers placed in upper end of excavation.
photCL SCE 02 - 44574

Visual Materials
Big Creek, Vermilion Dam - Aux[iliary] Drain #2. Tarpaper protection over cobble laterals.
photCL SCE 02 - 44576

Visual Materials
Big Creek, Vermilion Dam - Excavating toe drains on downstream side of dam.
photCL SCE 02 - 44139

Visual Materials
Big Creek, Vermilion Dam - Fill over toe drains downstream.
photCL SCE 02 - 44310

Visual Materials
Big Creek, Vermilion Dam - Concrete drainage from Toe Drains.
photCL SCE 02 - 44333