Visual Materials
Vermilion Dam - Completed auxiliary drain - Vermilion Dam.
photCL SCE 02 - 44621

Visual Materials
Vermilion Dam - Distributing cobbles around perforated pipe in lateral [french drain]
photCL SCE 02 - 44620

Visual Materials
Big Creek, Vermilion Dam - Installing 12" perforated drain [French drain] thru damp area near relief hole R-24. Note sand and gravel aroun pipe.
photCL SCE 02 - 43702

Visual Materials
Vermilion Dam - Auxiliary Drain #1, Toe drain outlet flooded by backwater from service spillway.
photCL SCE 02 - 44691

Visual Materials
Vermilion Dam - Experimental erosion control areas on downstream slope of dam.
photCL SCE 02 - 44614

Visual Materials
Big Creek, Vermilion Dam - Excavation complete. Junction of intermediate drain and toe drain.
photCL SCE 02 - 44288