Big Creek, Vermilion Dam - Auxiliary Drain #2. - Drain pipe completely installed. Cobble and gravel filter around perforated section.
photCL SCE 02 - 44580

Visual Materials
Big Creek, Vermilion Dam - Exposed auxiliary toe drain perforated pipe - New installed lateral drill.
photCL SCE 02 - 44695

Visual Materials
Big Creek, Vermilion Dam - Lateral Drains - Auxiliary Toe Drain.
photCL SCE 02 - 44698

Visual Materials
Big Creek, Vermilion Dam - View of completed lateral drains at upper end of auxiliary toe drain.
photCL SCE 02 - 44716

Visual Materials
Big Creek, Vermilion Dam - View of completed lateral drains at upper end of auxiliary toe drain.
photCL SCE 02 - 44717

Visual Materials
Vermilion Dam - Auxiliary Drain #1, Toe drain outlet flooded by backwater from service spillway.