Visual Materials
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Portal Powerhouse - Installing temporary 3/8" plate bulkhead at end of turbine branch of penstock inside structure.
photCL SCE 02 - 43777

Visual Materials
Portal Powerhouse - First stages of Scroll Case and Butterfly Valve.
photCL SCE 02 - 44617
Image not available
Visual Materials
Big Creek Powerhouse #3 - Unit 4 - Assembly of penstock & butterfly valve to turbine.
photCL SCE 02 - 28290

Visual Materials
Portal Powerhouse - Installation of penstock supports in pipe. View from downstream side of bulkhead.
photCL SCE 02 - 43654

Visual Materials
Portal Powerhouse - Installation of penstock supports in pipe. View from downstream side of bulkhead.
photCL SCE 02 - 43655

Visual Materials
Big Creek - Mammoth Pool - Upper butterfly valve, Tunnel Portal, and Anchor "F".
photCL SCE 06 - 46240