    Visual Materials

    Portal Powerhouse - Temporary backing to reduce vibration in 3/8" plate bulkhead in turbine Wye branch inadequate; it was replaced with concrete disc back by I-beams.

    photCL SCE 02 - 43898

  • Portal Powerhouse - Butterfly valve attached to turbine nozzle

    Portal Powerhouse - Butterfly valve attached to turbine nozzle

    Visual Materials

    Portal Powerhouse - Butterfly valve attached to turbine nozzle - Penstock bulkhead still in place.

    photCL SCE 02 - 44608

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Gravel accumulated during spring and summer diversion at lower end of Turbine Wye Branch of Penstock. Estimated amount approx. 2 cu. yards with gravel arranging from 3' to 4" in size.

    photCL SCE 02 - 44805

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Installation of penstock supports in pipe. View from downstream side of bulkhead.

    photCL SCE 02 - 43654

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Installation of penstock supports in pipe. View from downstream side of bulkhead.

    photCL SCE 02 - 43655

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Up tailrace channel from under bridge, during outage to install triangular restriction at end of branch of penstock.