Portal Powerhouse
You might also be interested in

Portal Powerhouse
Visual Materials
Portal Powerhouse - Staging for inserting I-beams and penstock into pipe.
photCL SCE 02 - 43651

Portal Powerhouse
Visual Materials
Portal Powerhouse - Outer end of 12' pipe showing install of I-beams for supporting penstock.
photCL SCE 02 - 43650

Portal Powerhouse
Visual Materials
Portal Powerhouse - Installing backing I-beams (15") prior to forming for concrete. Strengthening to reduce vibration during high flows.
photCL SCE 02 - 43902

Portal Powerhouse
Visual Materials
Portal Powerhouse - Temporary backing to reduce vibration in 3/8" plate bulkhead in turbine Wye branch inadequate; it was replaced with concrete disc back by I-beams.
photCL SCE 02 - 43898

Portal Powerhouse
Visual Materials
Portal Powerhouse - Installation of penstock supports in pipe. View from downstream side of bulkhead.
photCL SCE 02 - 43654

Portal Powerhouse
Visual Materials
Portal Powerhouse - Installation of penstock supports in pipe. View from downstream side of bulkhead.
photCL SCE 02 - 43655