    Portal Powerhouse - Setting pump for the first pumping of pool at end of 12' diameter pipe.

    photCL SCE 02 - 43309

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - 12' diameter pipe installed to reduce pressure at portal during high flows. At time, the lower baffle was still there at outlet restricting end area.

    photCL SCE 02 - 43917

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Applying Protex protective coating to first section of 8.5' diameter penstock pipe prior to pulling into 12' diameter pipe for second section make-up.

    photCL SCE 02 - 43570

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - View of 8.5' diameter penstock pipe supports inside 12' diameter outlet pipe, Ward Tunnel.

    photCL SCE 02 - 43560

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - Placing concrete in supporting wall under end of 12' diameter pipe. Excavating old concrete anchor. [Forming new] foundation & Wye branch anchor.

    photCL SCE 02 - 43529

  • Portal Powerhouse

    Portal Powerhouse

    Visual Materials

    Portal Powerhouse - View showing leakage through tunnel dump fill from diversion ditch during 490 c.f.s. flow, spilling into pool at end of 12' pipe.

    photCL SCE 02 - 43298