Visual Materials
Big Creek #1
You might also be interested in

Big Creek #1
Visual Materials
Big Creek #1 - Switchyard, placing tile drains and assembly of Switchyard steel.
photCL SCE 02 - 28464

Big Creek #1
Visual Materials
Big Creek #1 - Tile drains on north slope of Switchyard excavation.
photCL SCE 02 - 28472

Big Creek #1 - Switchyard
Visual Materials
Big Creek #1 - Switchyard - drilling for pile footings.
photCL SCE 02 - 28333

Big Creek #1 - Switchyard
Visual Materials
Big Creek #1 - Switchyard - tamping fill around pile casing.
photCL SCE 02 - 28338

Big Creek, Vermilion Dam
Visual Materials
Big Creek, Vermilion Dam - Excavating toe drains on downstream side of dam.
photCL SCE 02 - 44139

Big Creek #1
Visual Materials
Big Creek #1 - Switchyard, excavation for tile drain.
photCL SCE 02 - 28310