Visual Materials
Big Creek #1
- Description
- Big Creek #1 - Tile drains on north slope of Switchyard excavation.
- Date
- 10/20/1948
- Call number
- photCL SCE 02 - 28472
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek #1 - Switchyard, placing tile drains and assembly of Switchyard steel.
photCL SCE 02 - 28464

Visual Materials
Big Creek #1 - Switchyard, excavation for tile drain.
photCL SCE 02 - 28310

Visual Materials
Big Creek #1 - Switchyard excavating for drains and pile foundations.
photCL SCE 02 - 28312

Visual Materials
Big Creek #1 - Switchyard excavation showing high ground water condition.
photCL SCE 02 - 28224

Visual Materials
Big Creek #2 - Excavation for tower bracing on first tower post Switchyard rack.
photCL SCE 02 - 28485