Visual Materials
Borel Powerhouse - Borel
You might also be interested in

Borel Powerhouse - Borel
Visual Materials
Borel Powerhouse - Borel - Flow conditions at inlet end of Rich Gulch Siphon with 500 cfs flow in canal.
photCL SCE 02 - 40220

Borel Powerhouse - Borel
Visual Materials
Borel Powerhouse - Borel - Shot showing flow conditions at temporary lower cut-over, with estimated flow at 500 cfs..
photCL SCE 02 - 40218

Borel Powerhouse - Borel
Visual Materials
Borel Powerhouse - Borel - View of flow conditions at downstream end of Refugio flume after water was turned in canal on Feb 10., estimate flow 400 c.f.s.. Freeboard at time was 51"
photCL SCE 02 - 40221

Borel Powerhouse - Borel
Visual Materials
Borel Powerhouse - Borel - Flow conditions at outlet end of Rich Gulch Siphon with approximately 500 cfs flow.
photCL SCE 02 - 40219

Borel Powerhouse - Borel
Visual Materials
Borel Powerhouse - Borel - View taken at 4:30 P.M. on Feb. 10, showing flow conditions at inlet gate structure. Estimated flow 50 cfs.
photCL SCE 02 - 40211

Portal Powerhouse
Visual Materials
Portal Powerhouse - Lower end of new diversion after first flow of 400 cfs, during outage to install restriction.
photCL SCE 02 - 43926