Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Borel Powerhouse - Borel



You might also be interested in

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - Shot showing flow conditions at temporary lower cut-over, with estimated flow at 500 cfs..

    photCL SCE 02 - 40218

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - Flow conditions at inlet end of Rich Gulch Siphon with 500 cfs flow in canal.

    photCL SCE 02 - 40220

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - Flow conditions at outlet end of Rich Gulch Siphon with approximately 500 cfs flow.

    photCL SCE 02 - 40219

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - View showing flow conditions at lower end of Tilley #3 on day canal was returned to service (flow 400 cfs).

    photCL SCE 02 - 40215

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - Inlet gate structure under construction.

    photCL SCE 02 - 40206

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - View of flow conditions at downstream end of Refugio flume after water was turned in canal on Feb 10., estimate flow 400 c.f.s.. Freeboard at time was 51"

    photCL SCE 02 - 40221