Visual Materials
Borel Powerhouse - Borel 3rd Stage
You might also be interested in

Borel Powerhouse - Borel 3rd Stage
Visual Materials
Borel Powerhouse - Borel 3rd Stage - Sheet piling being placed in 16' trench prior to driving to full depth.
photCL SCE 02 - 40081

Borel Powerhouse - Borel 3rd Stage
Visual Materials
Borel Powerhouse - Borel 3rd Stage - Excavation for new canal radial intake gates and transition.
photCL SCE 02 - 40079

Borel Powerhouse - Borel Conduit - 3rd stage
Visual Materials
Borel Powerhouse - Borel Conduit - 3rd stage - Placing concrete in form for 1st section of 10'6" diameter pipe.
photCL SCE 02 - 40023

Borel Powerhouse - Borel 3rd Stage
Visual Materials
Borel Powerhouse - Borel 3rd Stage - Looking south from north end showing last of rock excavation in trench around Station 3+00.
photCL SCE 02 - 40078

Borel Powerhouse - Kern River Borel 3rd stage
Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - Progress picture of trench excavation for Kern River Siphon. View looking north from south end.
photCL SCE 02 - 40049

Borel Powerhouse - Borel 3rd Stage - Tilley #3
Visual Materials
Borel Powerhouse - Borel 3rd Stage - Tilley #3 - Preparation for support for floor slab in concrete box flume. Excavation through bulkhead at north end for new bulkhead and open transition.
photCL SCE 02 - 40075