Visual Materials
Borel Powerhouse - Kern River - Borel 3rd stage - Shows work accomplished on construction of new concrete flume at Tilley #3 prior to canal outage when steel flume can be removed. Concrete piers raised and backfilled for floor slab support with the exception of two center spans which were left open for drainage.
photCL SCE 02 - 40043

Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - Progress picture showing placement of transit-mix concrete in pier forms - Overflow Dam.
photCL SCE 02 - 40051

Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - Progress picture during construction of overflow dam.
photCL SCE 02 - 40045

Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - Progress picture of trench excavation for Kern River Siphon. View looking north from south end.
photCL SCE 02 - 40049

Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - Progress picture taken from north bank of diversion channel looking south along centerline of siphon.
photCL SCE 02 - 40050

Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - American Pipe Company's field plant for fabrication of pipe siphons. Lowering outer steel form for 10'6" diameter by 16' long section of concrete pipe. Progress picture during construction of overflow dam.
photCL SCE 02 - 40047