Visual Materials
Big Creek No. 1 - Rebucketing Unit No. 2 - Close-up showing counterweight on bucket No.3 which has not been cut to clear rim of wheel.
photCL SCE 02 - 24846
Image not available
Visual Materials
Exterior shots of Powerhouse No. 2, full shot of Powerhouse 2 and 2A, generator floor in Powerhouse 2, Unit 6 bucket failure (Powerhouse 2) with close-ups of damage, damage to overhead crane from flying No. 10 bucket, Powerhouse 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gate house, penstock "Y"s, rotor installation, Powerhouse 2.
photCL SCE

Visual Materials
Big Creek, Florence Lake Dam - Looking down on location of dump - Florence Lake tunnel adit. Man standing with rod behind fence on spot where excavation will commence.
photCL SCE 02 - 06430
Image not available
Visual Materials
Powerhouse 1 and penstocks, Dam 4 sluicing, switchrack, switchboards in Powerhouse 1, Unit 1 fire, bucket strain-gauge test, bucket molds, bucket repairs, lapping journals, coil replacements in stator, rebuilding Unit 4, removing rotor for repair, break in penstock at Powerhouse 1, debris and boulders that washed into the powerhouse after penstock break, and details of ripped penstock.
photCL SCE

Visual Materials
Big Creek No. 1 - Rebucketing Unit No. 2 - Close-up showing typical amount of grinding and chipping necessary on front and back of rims for wheel clearance on buckets 10, 22, 44, 46, 47, 48, 52, and 53 (Mfgs' numbers).
photCL SCE 02 - 24847

Visual Materials
Big Creek PH #2 - Looking down on P.L. from spot where rail started down killing two men.
photCL SCE 02 - 06037