Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Boulder-Chino Transmission Line (2nd) - Placing concrete for pile footings from Ready Mix truck - M227-T3.
photCL SCE 02 - 23264

Visual Materials
Boulder-Chino Transmission Line (2nd) - Drilling holes for concrete piles in Vineyard at location M218-T2.
photCL SCE 02 - 23261

Visual Materials
Boulder-Chino Transmission Line (2nd) - Placing concrete for tower foundations by "Hi-Line"
photCL SCE 02 - 23239

Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting Tower Steel with Byers crane at Location M55-T2.
photCL SCE 02 - 23248

Visual Materials
Boulder-Chino Transmission Line (2nd) - Tensioning Conductor at M91-T2.
photCL SCE 02 - 23267

Visual Materials
Boulder-Chino Transmission Line (2nd) - Installing transposition tower. M39-T2
photCL SCE 02 - 23252