Visual Materials
Boulder-Chino Transmission Line (2nd)
You might also be interested in

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Transposition at M107-T2 showing extension straps in Dead End Strings.
photCL SCE 02 - 23269

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting Tower Steel with Byers crane at Location M55-T2.
photCL SCE 02 - 23248

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting tower by hand using a 25 foot Floating Gin Pole at Tower M202-T2.
photCL SCE 02 - 23537

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Transposition at M216-T3 alongside first Boulder-Chino T/L.
photCL SCE 02 - 24424

Boulder-Chino Transmission Line (2nd) - Erecting tower with Byer's Crane
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting tower with Byer's Crane - M192-T2.
photCL SCE 02 - 23538

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Installing bird guards at M113-T1
photCL SCE 02 - 23270