Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Boulder-Chino Transmission Line (2nd) - Tensioning conductor at M199-T1.
photCL SCE 02 - 23543

Visual Materials
Boulder-Chino Transmission Line (2nd) - "Clipping-in" conductor at Tower M28-T4.
photCL SCE 02 - 23245

Visual Materials
Boulder-Chino Transmission Line (2nd) - 220kV line backfilled lower base at Mile 134-T2.
photCL SCE 02 - 30058

Visual Materials
Boulder-Chino Transmission Line (2nd) - Pulling out conductor with winch tractor at M201-T3.
photCL SCE 02 - 23544

Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting bridge with insulators attached at M142-T2
photCL SCE 02 - 23271

Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting Tower Steel with Byers crane at Location M55-T2.
photCL SCE 02 - 23248