Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Boulder-Chino Transmission Line (2nd) - "Clipping-in" conductor at Tower M28-T4.
photCL SCE 02 - 23245

Visual Materials
Boulder-Chino Transmission Line (2nd) - "Hanging up" bottom panels of tower by hand at M220-T5.
photCL SCE 02 - 23541

Visual Materials
Boulder-Chino Transmission Line (2nd) - Transposition at M107-T2 showing extension straps in Dead End Strings.
photCL SCE 02 - 23269

Visual Materials
Boulder-Chino Transmission Line (2nd) - Making up conductor dead-end connection.
photCL SCE 02 - 23550

Visual Materials
Boulder-Chino Transmission Line (2nd) - Placing concrete for tower foundations by "Hi-Line"
photCL SCE 02 - 23239

Visual Materials
Boulder-Chino Transmission Line (2nd) - Installing transposition tower. M39-T2
photCL SCE 02 - 23252